Evaluation of a 5-Year Forecast

Joseph Vederman
1978 Bulletin of The American Meteorological Society - (BAMS)  
A forecast 5 years in advance for each of 6 successive days is verified. Although the forecast has some interesting features, forecasters did not rate it highly. The forecast correlates lower with verifying observations than a monthly normal forecast does.
doi:10.1175/1520-0477-59.12.1598 fatcat:m6xlhxqlx5brhgwevq3vyizdzy