A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
Time Calibration of the LHCb Muon System
2006
2006 IEEE Nuclear Science Symposium Conference Record
The LHCb muon System consists of about 122,000 frontend channels. It plays a basic role in the first trigger level. The trigger requires 95% efficiency in muon tracks detection. It is then necessary to reach a system time alignment at the level of about 2 ns. This alignment must be monitored against possible fluctuations due to changes in the detector operating conditions. We describe the custom instrumentation implemented at system level for time calibration, the strategy adopted, the
doi:10.1109/nssmic.2006.356078
fatcat:pxmkbbv3vbfydgk5tn4svaqyru