A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
A New Approach for Maintenance Scheduling of Generating Units in Power Market
2006
2006 International Conference on Probabilistic Methods Applied to Power Systems
In this paper, a new approach for maintenance scheduling of generating units of GENCOs in competitive environment is presented. In this environment, management of GENCOs and grid is separated, each maximizing its own benefit. The objective function for the GENCO is to sell electricity as much as possible, according to the market clearing price forecast. Various technical constraints such as generation capacity, duration of maintenances and maintenance continuity are being taken in to account.
doi:10.1109/pmaps.2006.360432
fatcat:gyuzxtca75fxjhgts4ad2imnsa