A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
A Multi-Period Order Selection Problem in Flexible Manufacturing Systems
1998
Journal of the Operational Research Society
We consider a multi-period order selection problem in¯exible manufacturing systems, which is the problem of selecting orders to be produced in each period during the upcoming planning horizon with the objective of minimising earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not ®nished on time, while subcontracting cost is incurred if an order is not selected within the planning horizon (and must be subcontracted) due to
doi:10.2307/3010477
fatcat:koqzfipzxfbqpcfnkleea4b2pa