A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
Task network-based project dynamic scheduling and schedule coordination
2010
Advanced Engineering Informatics
npsi/ctrl?lang=en http://nparc.cisti-icist.nrc-cnrc.gc.ca/npsi/ctrl?lang=fr Access and use of this website and the material on it are subject to the Terms and Conditions set forth at Task network-based project dynamic scheduling and schedule coordination Hao, Q.; Shen, W.; Xue, Y.; Wang, S. http://www.nrc-cnrc.gc.ca/irc T a sk ne t w ork -ba se d proje c t dyna m ic sc he duling a nd sc he dule c oordina t ion NRCC-52705 Hao, Q.; Shen, W.; Xu, Y.; Wang, S.
doi:10.1016/j.aei.2010.07.001
fatcat:zprlra5khzbcdepmbz7fddqpbq