Recent progress of the development of a long pulse 140GHz ECRH system on EAST
2019
EPJ Web of Conferences
A long pulse ECRH system with a goal of 140GHz 4MW 100~1000s has been developed to meet the requirement of steady-state operation on EAST. Gycom gyrotrons are employed in the No.1 and No.3 systems, CPI gyrotrons are used in the No.2 and No.4 systems. The development of the two Gycom gyrotron systems has been finished. The first short pulse EC wave injection has been demonstrated successfully during the EAST 2015 Spring campaign. In the commissioning and operation towards steadystate operation,