Understanding The Cost Of Retrofitting Co2 Capture In A Integrated Oil Refinery [report]

IEAGHG
2017 Zenodo  
IEAGHG Technical review 2017-TR8. This report was prepared as an account of the work sponsored by IEAGHG, CLIMIT, Concawe and SINTEF.
doi:10.5281/zenodo.1179376 fatcat:65264rhxxrhctazcfoflzihcdu