Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective
2021
Journal of Construction in Developing Countries
Design-build (D-B) had been applied in many advanced countries because the delivery method improves construction project success. While several megaprojects in Malaysia have adopted D-B, it is still uncommon in the local construction industry. Therefore, understanding the key drivers that are affecting the acceptance or rejection of D-B is crucial. However, that information is lacking in the existing body of knowledge. Thus, this research addresses that issue by identifying the key drivers for
doi:10.21315/jcdc2021.26.1.7
fatcat:gngzoll6fbgw5knaapxwjewbry