Cost and performance of rapid-cycling proton synchrotrons
PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)
Alternative rapid-cycling proton synchrotrons using resonant magnet power supply systems are examined as possible replacements for the Fermilab 8-GeV Booster Synchrotron. The baseline machine, with 16 GeV maximum kinetic energy, would replace the Booster and also function as the first stage of a neutrino factory. The study described here uses the cost estimates of the baseline design to scale costs for alternate machine designs with the same functional requirements as the baseline machine.
doi:10.1109/pac.2001.988095