A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
Improvement in Performance of the Blast Furnace at Bhilai through Statistical Analysis and Improvement in Burden Preparation
1991
ISIJ International
The present paper reports the performance analysis of the blast furnace 'X' of Bhilai Steel Plant (BSP). Special reference has been madeto the process variables related to the burden, such as sinter. The analysis shows that the burden rate has beenthe most significant variable for the coke rate followed by the temperature of hot blast. A change in burden rate has been mainly reflected by a change in the weight ot raw limestone in the burden. Considerable saving in coke rate is achieved by
doi:10.2355/isijinternational.31.669
fatcat:norz2vahlbfkxiifwfc5oisfim