A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Automatic generation of car shunting scheduling in railway car depots
2008
Computers in Railways XI
unpublished
A train schedule defines each train's arrival/departure time at a car depot. Between the arrival and departure times, every train has to have its designated works, such as inspection and cleaning of the cars, completed, which are predefined by a car operation schedule. The planner of car shuntings at a car depot must create a schedule that satisfies the above-mentioned conditions, while also taking care of other constraints, such as work places, length of tracks, crossover blockings of shunting
doi:10.2495/cr080571
fatcat:v5tdqy3nebattld4ybneb25zum