A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
Utilization of Path-Clustering in Efficient Stress-Control Gate Replacement for NBTI Mitigation
2017
IEICE Transactions on Fundamentals of Electronics Communications and Computer Sciences
Replacement of highly stressed logic gates with internal node control (INC) logics is known to be an effective way to alleviate timing degradation due to NBTI. We propose a path clustering approach to accelerate finding effective replacement gates. Upon the observation that there exist paths that always become timing critical after aging, critical path candidates are clustered to select representative path in each cluster. With efficient data structure to further reduce timing calculation, INC
doi:10.1587/transfun.e100.a.1464
fatcat:emycnt63jbg4nbiyu3vkxuaapa