A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Geotechnical study for analyzing slope stability between two mining pit boundary
2022
Indonesian Mining Journal
This paper is a new concept to increase the safety and mining conservation on PT-X and PT-Y with no boundary gap between the two areas. To optimize coal recovery as a basis of supporting conservation, the two companies needed to adjust coal production in terms of avoiding technical problems at the mining time process due to the rock structure and coal seam at the border were the same. PT-X plans to produce 2 million tons of coal, but the government only approved 1 million tons, while PT-Y still
doi:10.30556/imj.vol25.no1.2022.1279
fatcat:aat4j662gbbrjgddzir473rdzm