A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Integration of Agents in the Construction of a Single-family House through Use of BIM Technology
2014
Procedia Engineering
The tools and work methodologies currently employed in the construction industry do not allow evolution to face up to market demands. There being, in addition, less time for project planning for which more detailed specifications are required and which strive for productive efficiency. In light of this, the development and application of production methods that favour multidisciplinary, integrated and collaborative work between the agents that compose the construction process is essential. BIM,
doi:10.1016/j.proeng.2014.03.029
fatcat:l55fbig2orbrnetpl6a67wdyeq