A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Design A Suspended Access Equipment Type Elbow JIB With Combination Butterfly Jib Cradle For Bidex Lot VII Building
2022
Proceedings of the First Multidiscipline International Conference, MIC 2021, October 30 2021, Jakarta, Indonesia
unpublished
The Bidex Lot VII building was built in a new commercial area in the CBD BSD, South Tangerang, Banten province. So, tools are needed for the maintenance and repair of the building, precisely in this case it is for the maintenance of the building's facade which must be cleaned regularly and also maintained and repaired if there is a leak on the facade. The problem that occurs because this building has a height of 125 meters will be a problem if in its maintenance there is no tool that is able to
doi:10.4108/eai.30-10-2021.2315721
fatcat:zgfhffus4rgudb2ashl6rufvqq