A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Process Improvement in Feedback Adjustment
2012
Communications for Statistical Applications and Methods
Process adjustment, also called engineering process control(EPC), is applied to maintain process output close to a target value by manipulating controllable variables, but special causes may still make the process deviate from the target and result in significant costs. Thus, it is important to detect and mediate deviations as early as possible. We propose a one-step detection method, the moving search block(MSB), with which the time and type of a special cause can be identified in short
doi:10.5351/ckss.2012.19.3.395
fatcat:g7o5kxqnn5a6ng6kdr56v4zdmu