A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
A hybrid algorithm for unrelated parallel machines scheduling
2016
International Journal of Industrial Engineering Computations
In this paper, a new hybrid algorithm based on multi-objective genetic algorithm (MOGA) using simulated annealing (SA) is proposed for scheduling unrelated parallel machines with sequencedependent setup times, varying due dates, ready times and precedence relations among jobs. Our objective is to minimize makespan (Maximum completion time of all machines), number of tardy jobs, total tardiness and total earliness at the same time which can be more advantageous in real environment than
doi:10.5267/j.ijiec.2016.2.004
fatcat:y7uezg4vkrd75cmetwb6jczle4