Compacted Cohesive Test Embankment: Design, Installation and Operation of Field Instrumentation : Interim Report [report]

Wiiliam DeGroff
1973 unpublished
This report describes the design, installation and operation of field instrumentation for a forty foot high test embankment on SR 37 near Bloomington, Indiana. Photographs and descriptions of detailed features of the installation are included for guidance of those who may make similar installations in the future. 17.
doi:10.5703/1288284313842 fatcat:rfpvsqzjjvgohhqlyzs6i7422u