A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Risk management system and intelligent decision-making for prefabricated building project under deep learning modified teaching-learning-based optimization
2020
PLoS ONE
retracted
This study establishes a model of prefabricated building project risk management system based on the Modified Teaching-Learning-Based-Optimization (MTLBO) algorithm and a prediction model of deep learning multilayer feedforward neural network (Backpropagation, BP neural network) to improve the requirements of risk management during the construction of large prefabricated building projects. First, we introduced the BP neural network algorithm based on deep learning. Second, the traditional
doi:10.1371/journal.pone.0235980
pmid:32678855
pmcid:PMC7367478
fatcat:4ifq5l7n55fdpaw5qk7ib74qqi