A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
2009
Computers and Chemical Engineering
In this work, we describe short-term and medium-term scheduling for a largescale industrial continuous plant. For medium-range scheduling, two subproblems are solved using a rolling horizon based decomposition scheme. An upper-level model is used to find the optimal number of products, and length of the time horizon to be considered for solving the lower level short-term scheduling problem. At the lower level, we proposed an improved model for short-term scheduling of continuous processes using
doi:10.1016/j.compchemeng.2008.08.013
fatcat:pkfrr4ieqbfxpj7jjowpj3qfve