Analisa RII (Relative Important Index) Terhadap Faktor-Faktor yang Berpengaruh dalam Mengimplementasikan BIM 4D dan M-PERT pada Pekerjaan Struktur Bangunan Hunian Bertingkat Tinggi

Albert Eddy Husin, Frisky Sustiawan
2021 Jurnal Aplikasi Teknik Sipil  
This study discusses the factors influencing BIM 4D and M-PERT implementation on highrise residential building structures using RII (Important Relative Index) analysis. The research was conducted using a quantitative descriptive method by distributing questionnaires to practitioners related to the work of high-rise residential structures. The study found that ten factors had the most influence on implementing BIM 4D and M-PERT on high-rise residential structures, namely other detailed drawings,
more » ... project schedule, percentage of delays. , activity modeling, project activity integration, network similarity, building design planning, scheduling integration, visualization, increase productivity Kata kunci: M-PERT, BIM 4D, Penjadwalan, Proyek konstruksi Penelitian ini membahas mengenai faktor -faktor yang berpengaruh dalam mengimplementasikan BIM 4D dan M-PERT pada pekerjaan struktur bangunan hunian tingkat tinggi dengan menggunakan Analisa RII (Relative Important Index). Penelitian dilakukan dengan metode deskriptif kuantitatif dengan menyebar kuisoner ke praktisi yang berkaitan dengan pekerjaan struktur hunian bertingkat tinggi, hasil penelitian didapatkan bahwa ada 10 faktor paling berpengaruh terhadap implementasi BIM 4D dan M-PERT pada pekerjaan struktur hunian bertingkat tinggi, yaitu antara lain detail gambar, schedule proyek, presentase keterlambatan, pemodelan aktivitas, penggabungan kegiatan proyek, kemiripan jaringan, perencanaan desain bangunan, integrasi penjadwalan, visualisasi, dan meningkatkan produktivitas
doi:10.12962/j2579-891x.v19i4.9336 fatcat:g2i7a7zpaff6lf424asiecmjey