D Minus 1 Production Scenario: Production Model for Produced Hospital Furniture
[chapter]
2020
Concepts, Applications and Emerging Opportunities in Industrial Engineering [Working Title]
Many kinds of production systems are used in medical equipment industries, one of which is through the work-in-process (WIP) buffer control system and feeding material scenarios to assure ability of the process to produce the expected throughput. The production model, known as the D minus 1 production scenario, is used to control production activities at the factory to be carried out using the day minus 1 rule. This rule is a time-based buffer production scenario in 1 day, ending at the