A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2015; you can also visit the original URL.
The file type is application/pdf
.
Integration of simulation and Pareto-based optimization for space planning in the finishing phase
2013
2013 Winter Simulations Conference (WSC)
In order to improve the flexibility and adaptability of an automated model to various different projects under different circumstances, various solutions should be generated as proposed results, instead of only one solution as in recent research. This paper therefore presents a method for generating a series of reasonably detailed schedules for mapping the workplaces of activities over time. This model incorporates Pareto-based optimization and simulation. The optimization engine takes on the
doi:10.1109/wsc.2013.6721685
dblp:conf/wsc/DangB13
fatcat:pzhqnmppwzd4ffrohaouulrip4