Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
2017
MATEC Web of Conferences
This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower system, which is done by optimizing the variables of operation control in the hydropower plant at Lake Himreen -Diyala Dam. The variables mentioned are net turbine head, the rate of water flow and