A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
STUDY ON TEMPORARY BREACH CLOSURE FOR LEVEES
堤防決壊時に行う緊急締切作業の効率化に向けた技術検討
2018
Advances in River Engineering
堤防決壊時に行う緊急締切作業の効率化に向けた技術検討
2 正会員 工博 寒地土木研究所寒地河川チーム(〒062-7602 北海道札幌市豊平区平岸1条3丁目) 3 正会員 工博 一般財団法人北海道河川財団(〒060-0807 北海道札幌市北区北7条西4丁目5-1) 4 非会員 一般財団法人北海道河川財団(〒060-0807 北海道札幌市北区北7条西4丁目5-1) It is important mitigating flood damage by overflow from a levee breached. Damage mitigation can be expected by temporarily closing the levee breach and reducing the amount of flood water exiting the breach. However, the method has not been clarified. We collected cases of breach closure at the time of disaster, and conducted experiment on
doi:10.11532/river.24.0_645
fatcat:cgz3fzqwibcr5j5cxgn26dan2m