PRIMERI SANACIJE AB MOSTOVA MANJIH RASPONA
2019
Zbornik Radova Građevinskog Fakulteta
The paper presents conducted rehabilitations on two bridges over the Paklešnice River, as well as the rehabilitation of the bridge over the Kravaričkog Brook at the Forestry House in Gornji Lajkovac Municipality of Mionica. Prior to the conducting control structural analysis of bridges and testing the quality of installed materials: concrete and reinforcement, detailed recording of all necessary dimensions of existing bridges was performed. On the basis of the performed measurements and