Development of a 25MW Geothermal Power Plant full scope simulator based on a control system graphical modeling
2009
Proceedings of the 2009 Winter Simulation Conference (WSC)
This paper describes the development of an Operator Training Simulator (OTS) for the Geothermal Training Simulation Center (GTSC) of the Mexico's Federal Commission of Electricity (CFE). The Department of Simulation (DS) of the Electrical Research Institute (IIE) developed this simulator using as reference the Unit IV of the Geothermal Power Plant Cerro Prieto, located at the north of Mexico. The Cerro Prieto 25MW simulator was finished and delivered to GTSC in June 2007. This simulator is a
doi:10.1109/wsc.2009.5429304
dblp:conf/wsc/Romero-JimenezJTA09
fatcat:lkcqyyxpafhw5ctedih63jhvca