on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model
2012
Systems Engineering Procedia
In view of the previous studies on uncontrollable construction cost, which mostly were based on the practical experiences and subjective speculating, the conclusions were empirical and lack of data support. In order to solve this problem, the quantitative analysis methods are introduced here. The application of ABC analysis method can distinguish the minor-key factors from tremendous factors which influence the cost changes. And the complete decomposition of construction cost changes can
doi:10.1016/j.sepro.2011.11.087
fatcat:h42ymdljkvfj5magrbuoo5mv7q