An efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters and machine configuration will be achieved at the beginning of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience but additional ways to reduce the time required to setup collisions are possible. In this paper, the 2011 turn-around performance is reviewed and the benefits of