FAST-PACED CONSTRUCTION OF THE NEW KHALIFA PORT BRIDGE PROJECT
[dataset]
2018
The significant growth and development in the United Arab Emirates in recent years necessitated considering advanced construction techniques for bridge structures. This paper presents features of the New Khalifa Port Project which consisted of bridge structures with a combined length of 3.64 km. The strict project design criteria, schedule and budget represented significant challenges which required considering specific designs using efficient precast elements and construction methods. The
doi:10.14455/isec.res.2018.27