The integrated prediction system for geological conditions ahead of tunnel faces [chapter]

S Shirasagi, T Yamamoto, Y Mito, M Ashraf
2011 Harmonising Rock Engineering and the Environment  
It is essential to employ the observational design and construction method to manage tunnel projects efficiently. The original tunnel design is immediately verified or modified based on the in-situ data sequentially obtained in the construction stage. This study proposes an integrated prediction system for geological conditions ahead of tunnel faces, which is composed of long-interval, middle-interval, and short-interval prediction subsystems. The applicability of those subsystems is verified
more » ... stems is verified with actual field data. Subject: Information system, artificial intelligence and other advanced techniques