SUPERFICIAL COST MODEL FOR COMPOSITE PAVEMENTS (A CASE STUDY OF CONCRETE GRADE 30 BASE AND ASPHALT OVERLAY 25mm)

Boris Sasraku-Neequaye, Michael Adow, Seth Emmanuel, Allotey
2017 International Journal of Advanced Engineering Research and Technology (IJAERT)   unpublished
The aim of construction cost forecasting is to provide an estimate of a construction project. All the relevant stakeholders are interested in knowing the financial implications of a project. There are various procedures used by building professionals to predict the construction cost of projects. In order to predict construction costs, models have been developed by Building and Engineering professionals. Model is a procedure developed to reflect, by means of derived processes, adequate
more » ... output for an established series of input of cost variables inherent in a building design to secure improved costs forecasts and /or design optimization. This study aims at developing a construction cost model for evaluating road projects in Ghana. The method used in developing the model is based on the superficial method of calculating total construction costs.
fatcat:dqojs75qi5fpdkjnqr6mss4c4e