A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Historical perspectives of engineering project design, organisation and management: construction of the Elan Valley dams
2013
Engineering Project Organization Journal
__ Augmented and virtual technologies both play vital roles in the construction industry. Augmented technologies, however, have a higher benefit when compared to virtual. The two technology types are discussed; with their similarities and differences explained. The past, present, and future is described. Some benefits to using augmented technology are discussed. The drawbacks are mentioned, with the way to correct them detailed.
doi:10.1080/21573727.2013.805688
fatcat:fi4vh4twcfabpajkglr72ld3ye