EPON operates a number of power stations in the north of the Netherlands. At some of these the forced-draught-fans have been replaced by gas turbines. Unit 3 of Flevo Power Station was the latest repowering project in the Netherlands. This paper gives a description of the most important points of the mechanical, and process design of the combined cycle unit and the influence of the gas turbine on the starting procedure.