PT. SAMARINDA CENDANA COLD STORAGE DAN INDUSTRI DI ANGGANA

Oleh Heriyanto
unpublished
The study was conducted at PT. Samarinda Sandalwood Cold Storage dan Industry in Anggana during the month of February-March 2014, the data obtained from this study that there has been a decay of black shrimp ranged 20-30kg produced. This decay occurs because the black shrimp raw material processing completed different times that the processing starts at 07.30 am and finishes approximately at 9:30 to 10:00 am. Analysis using the Hungarian method of calculation results show after organized labor
more » ... er organized labor assignments on the production of subsection 5 in particular processing variations working group (Task: Cleaning, Proofreading, washing, weighing and preparation) obtained with the Hungarian method of processing completion time of 110 minutes more lower than the standard completion time of the company to task 5 variations of the working group that is equal to 150 minute. Thus assignments to 5 working group of optimal variation can be achieved by the company as follows: 1. Cleaning job is assigned to the working group III obtained sebsar 45 minute turnaround time for the production activities.
fatcat:fq3dx7n6erefhjevq2locapex4