A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Time-cost-quality-risk trade-off in GIGA projects using specific techniques of hunting dolphins
2016
International Journal of Industrial and Systems Engineering
Simultaneous reduction of the project cost and its performing duration was an essential necessity in today's rival environment. Quality, the effective parameter of optimization, as an effective indicator was attended by the costumers. So, due to the asymmetry between the two factors-Time and Cost and the factor of Quality it was essential to make the project decision in the best balanced conditions between the three factors. Project scheduling ,increasing the project quality level and sources
doi:10.1504/ijise.2016.075207
fatcat:mzc4ikoovnglbmdyqmv5nsrt5e