A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL. The file type is application/pdf.
application/pdf
風間 了. "大規模大深度地下工法の計画手法に関する研究 : 逆打工法によるHビルの地下工事の計画と実施 間瀬惇平,南林和,寺林肇,桂純二,亀田龍吉 199(評論-2)." AIJ Journal of Technology and Design 4.6 (1998) 246