First Results of Solaris Synchrotron Commissioning
2016
Solaris is a third generation light source recently constructed at the Jagiellonian University in Kraków. The installation of the 600 MeV S-band linear accelerator with thermionic RF gun and transfer line as well as the 1.5 GeV storage ring is now complete. In November 2014 subsystem tests and conditioning of the Solaris linac were started. A 300 MeV electron beam at the end of the linac was observed for the first time in February 2015 after which the machine was shut down for 2.5 months to