Construction of the breakwaters and beach fill beach erosion control commenced in October, 1993 and was completed in January, 1994. The project site is located on the northwestern shoreline of the Naval Air Station, on the Patuxent River entrance to Chesapeake Bay. To protect the 1,000 foot shoreline fronting an abandoned landfill, a 260 foot shore-connected breakwater and five discrete offshore breakwaters, with lengths ranging from 70 feet to 130 feet and crest elevations of +6.5 feet MLW,