A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
An Economic Analysis of the South-North Bali Connection Railway Plan in The Acceleration of Economic Equality Development in Bali, Indonesia
2019
European Journal of Engineering Research and Science
At present the economic development in the province of Bali between South and North Bali is very significant. This condition is presumed to be the transportation infrastructure for the connecting road of South Bali - the existing aiIDRort is not optimal. The alternative transportation infrastructure studied is the plan to build a railway line across South-North Bali. Mengwitani-Singaraja link road is required to be capable to provide more optimal accessibility so that there is an even
doi:10.24018/ejers.2019.4.3.1201
fatcat:whm6gzvbwbfm3kmpvemfvbk4xq