A Model for Shovel Capital Cost Estimation, Using a Hybrid Model of Multivariate Regression and Neural Networks
2017
Symmetry
Cost estimation is an essential issue in feasibility studies in civil engineering. Many different methods can be applied to modelling costs. These methods can be divided into several main groups: (1) artificial intelligence, (2) statistical methods, and (3) analytical methods. In this paper, the multivariate regression (MVR) method, which is one of the most popular linear models, and the artificial neural network (ANN) method, which is widely applied to solving different prediction problems