A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2021; you can also visit the original URL.
The file type is application/pdf
.
Allocation of Total Congestion Cost and load participation to Generators for a PoolCo Market in Deregulated Power System
2021
Advances in Science, Technology and Engineering Systems
The objective of this paper is to allocate transmission congestion cost to responsible generators using a novel method. Deregulation of the electrical power system leads to the compulsion of open access to the transmission system for all entities of the power system. There is a trend to utilize cheaper generators by all loads. This leads to a violation of the operational and physical constraints of transmission corridors connected to those generators. It is not possible to utilize cheaper
doi:10.25046/aj0601128
fatcat:fazbpbgdavdepmp775y724q3ue