Improvement on Management of Non-point Source Pollution for Reasonable Implementation of TMDL - Focusing on Selection of Non-point Source Pollution Management Region and Management of Non-point Source Pollutant -
수질오염총량관리제의 합리적인 시행을 위한 비점오염원관리 개선방안 - 비점오염원 관리지역 선정 및 비점오염물질 관리를 중심으로 -

Sang-Jin Yi, Young-Il Kim
2014 Journal of Korean Society of Environmental Engineers  
For effective implementation of total maximum daily load (TMDL), this study presented the improving plans of nonpoint source pollution management including the classification of non-point source pollution, calculation of non-point source pollution load (generated, discharged), selection of non-point source pollution management regions and management of non-point source pollutant. First of all, the definition of point source pollution and non-point source pollution based on the legal and
more » ... ic viewpoint should be precisely classified and managed. Especially, the forest, grassland and river without occurrence of environmental damage by activity of business and human should be separately classified natural background pollutants. The unit for generated and discharged non-point source pollution should be preferentially changed according to actual condition of watershed. The calculation methods of generated and discharged non-point source pollution should be corrected consideration on the amount and duration of rainfall. While the TMDL is implemented, non-point source pollution management regions should be selected in the watersheds exceed the targeted water quality standards by the rainfall. The non-point source pollution management regions should be selected in the minimal regions where have high values of discharged non-point source pollution density in the urban area, farmland and site area except forest, grassland in the whole watershed. The non-point source pollutant treatment facilities, which take into consideration non-point source pollution load per unit area, duration of the excess concentration, realizable possibility of treatment, effectiveness of treatment cost versus point source pollutant, should be established in the regions with a large generated non-point source pollution load and a high concentration of water quality exceed the targeted water quality standards by the rainfall.
doi:10.4491/ksee.2014.36.10.719 fatcat:34q6fc5hvfesfa52qpjpujhd7u