A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
The Problems of Planning a Timetable for Transport by Road in Terms of Theft Protection
2017
LOGI
In each transport, it is necessary to take into account the risks that may occur during transport. Most of these risks are associated with criminal activity, whether on a shipment, the driver himself or the vehicles used in potentially hazardous segments. The aim is to design a planning and verification process on a selected route or routes within Europe. The proposed transport route starts with load in the Kechnec Industrial Park and continues with two unloadings in Teplička nad Váhom in the
doi:10.1515/logi-2017-0004
fatcat:svebjhhrrjcttkoopgx2gmr43u