Flexible flow shop scheduling problem to minimize makespan with renewable resources
2019
Scientia Iranica. International Journal of Science and Technology
This paper deals with a flexible flow shop (FFS) scheduling problem with unrelated parallel machines and renewable resource shared among the stages. The FFS scheduling problem is one of the most common manufacturing environment in which there is more than a machine in at least one production stage. In such a system, to decrease the processing times, additional renewable resources are assigned to the jobs or machines, and it can lead to decrease the total completion time. For this purpose, a