FIRST RESULTS OF THE RADIOECOLOGICAL RESEARCH OF THE BELOYARSK NPP COOLING POND AFTER THE 4TH UNIT BN-800 COMMISSIONING
2018
Medico-Biological and Socio-Psychological Problems of Safety in Emergency Situations
Relevance. New units commissioning at the operating nuclear power plants may be associated with an increase in the radiation load on environment and human beings. The 4th Unit BN-800 was commissioned at the Beloyarsk nuclear power plant (BNPP) in 2016. The Beloyarsk artificial lake created in 1959–1963 serves as a cooling pond. A radioecological study of the cooling pond was performed in 2014 before the BN-800 Unit commissioning. Its results were published in the issue No. 2 of the present