A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
Force10 P10 Evaluation
[report]
2007
unpublished
FINAL Acknowledgements We are grateful to the LLNL ICS data center staff for providing the Force10 P10 devices used in this evaluation. We also thank Scott Campbell of LBL and Steven Carter of ORNL for taking the time to share their P10 experiences with us. Introduction The lack of an acceptable intrusion monitoring 1 solution limits the deployment of 10GE (10 Gigabit-per-second Ethernet) technology across the LLNL's unclassified network infrastructure. The desire to operate at 10GE motivates
doi:10.2172/919959
fatcat:j4fddzz2efa2tgke4ivdmkx3d4