A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Optimizing earthwork block removal in road construction
2010
In road construction, earthwork operations account for about 25% of the construction costs. Existing linear programming models for earthwork logistics optimization are designed to minimize the hauling costs and to balance the earth across the construction site. However, these models do not consider the removal of physical blocks that may influence the earthwork process. In this thesis, we extend the linear programming model of Mayer and Stark (1981) with the addition of a block removal
doi:10.14288/1.0070953
fatcat:nzsx6aqs3vg6po6loedlgenvju