Construction Stage Analysis of Cable-Stayed Bridges Using the Unstrained Element Length Method
무응력길이법을 이용한 사장교의 시공단계 해석
2016
Journal of the Korean Society of Civil Engineers
무응력길이법을 이용한 사장교의 시공단계 해석
The propose of this study is to demonstrate how efficiently and accurately the construction stages of cable-stayed bridges are analyzed using the unstrained length method (ULM) in which all unstrained element lengths are determined from a simplified analytical method (Jung et al., 2015) . A forward analysis of cable-stayed bridges using the commercial FEA program, MIDAS is sequentially carried out considering the lack of fit force but the ULM is able to analyze a intermediate construction stage
doi:10.12652/ksce.2016.36.6.0991