A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Real-time simulation and hardware-in-the-loop tests of a battery system
2015
2015 IEEE Power & Energy Society General Meeting
In this paper, a real time model of the microgrid with an energy storage system has been implemented in RT-Lab. Coordinated control of the battery storage system with a PV system is simulated. To be more realistic, hardware-in-theloop (HIL) testbed has been implemented with a real battery cell (3.2-V, 40-Ahr) connected to the real-time simulation model of the microgrid. A programmable current source (Magna) and programmable load (Bk 8500) have been used to create charging and discharging paths
doi:10.1109/pesgm.2015.7285993
fatcat:jcg5tb4za5c23isjg7lscexc3m